Construction Costs

Land prices have stabilized but construction costs are rising overall. There is some advantage to building in the fall to springtime part of the year.

Prices are rising between all materials and labour required for construction.

Read More
Paul Azad Paul Azad

Architectural Designs

Architectural designs are often in flux early in the design process. As you can see from the image, a similar square foot floor plan, can look very different from the outside.

Read More
Paul Azad Paul Azad

Structural Designs

How open a floor plan can be is heavily influenced by the Structural Engineer. Open floor plans, especially on the main floor, is often desired by clients constructing new homes.

Read More
Paul Azad Paul Azad

Plumbing Designs

Plumbing decisions and details should be made early in the design process. Strategic planning with the bathroom locations and kitchen layouts can save time and money.

Read More
Paul Azad Paul Azad

Electrical Designs

Electrical designs require input from clients, the electrical code, the Interior Designer, and the flawless installation from Master Electricians.

Read More